| Home > News/Events |
 |

 | 
Phase-I of Energy Saving Project in Phulpur-II | 
 |
|
 |
Phase-I of Energy Saving Project in Phulpur-II, comprising of LT Guard Scheme, has been commisioned on 25th March 2005. Photographs of the same are as under:
Sr. G M (Phulpur) performing 'Puja'

Jt. G M (Production) Opening PG inlet to LT Guard

View of LT Guard System in line

LT Guard catalyst (C-18-7 & C-18-G) reduction was carried out on 22nd-23rd March 2005. Main parameters of LT Guard System are as under:
Plant Load 82%
LT Guard inlet Temp. 193 deg. C
LT Guard outlet Temp. 208 deg. C
CO inlet to LT Guard 2.72 mol %
CO outlet from LT Guard 0.20 mol %
LTS inlet Temp. 193 deg. C
LTS outlet Temp. 193 deg. C
CO outlet from LTS 0.08 mol %
At 100% plant load, it is expected that CO slip at LT Shift Converter outlet shall be below 0.13 mol % as indicated in the PFD by HTAS. |
 |
 |